How long should renovation projects take

Home Renovation
A full on home renovation can take anywhere from 4 to 8 months.

Kitchen
On average, after the planning and design phases are complete, a total kitchen remodel takes about four to six weeks. This could be shorter if your project is less involved, or much longer if you run into unforeseen complications.

Bathroom
A bathroom remodel can take anywhere from two to six weeks to complete depending on how extensive your remodel is.

Windows
Windows usually take about four to eight weeks to manufacture. Windows are typically installed within one day.

Siding
This project can take about two weeks to complete. It depends on where your material is ordered from, but it usually takes about two to four weeks for a contractor to receive the materials.   

Roof
A roof replacement, including tear off and clean up, should usually take about a day to complete. If you have a large or complicated roof it may take two or three.

Deck
A standard 12x24 foot deck with a staircase should take about one to three weeks to build. This can change significantly with the size and intricacy of your project.    

Refinishing Hardwood Floors
Anywhere from two days to two weeks.

 